After receiving heat finally, yesterday, we were able to get some heat flowing to some radiators. So far we have found 3 cracked radiators. One in the master bath and two in the halls. The one in the master we can do without since we have another large unit and radiant heat. The two in the halls need to be swapped out. Barry suggests not using new radiators but making up the heat with high output baseboard elements producing high BTU's. Barry would build these himself and they would cost 60-70% less than the cost of new radiators.
The other issue involved with this is that there is asbestos wrapping both of these radiators. We have contacted the abatement company and will have it removed.
Barry is putting together the costs to replace the heat.
This blog is a way for us to keep track of everything that we talk about, suggest or do at your home over the life of our working relationship. It is updated, usually, on a daily basis during the project. Here we will record daily activity on the job, list recommendations on products and materials and add articles that pertain to your home.
Showing posts with label Asbestos. Show all posts
Showing posts with label Asbestos. Show all posts
Friday, January 11, 2013
Tuesday, July 17, 2012
Yet more asbestos
The following images are of areas exposed in the yellow and blue baths during demo. We will need to have these areas removed before continuing on.
Monday, June 25, 2012
Meeting Notes 6/22/12
Meeting by phone Pete Millington, Peter Stames
Agreed to rescission of the contract and generation of new contract to absorb Change Orders:
Agreed to rescission of the contract and generation of new contract to absorb Change Orders:
- #4 Extra Kitchen Demolition,
- #5 Guest Bath Demo,
- #6 Scope Cast Iron Plumbing,
- #7 Asbestos removal,
- #8 Basement Demolition,
- #9 Garage Door Openers,
- #10Additional Torsion Spring,
- #11 Brown Bath Demo.
- #14 Pest control
- #17 Temp fence for pool
Also included in the new contract is the plumbing restoration, kitchen demolition, master bath demolition and electrical demolition.
New contract will be generated by Wednesday the 27th at the latest. Change order sequencing will start over at #1.
_________________________________________________________________________________
New Change Order sequence waiting for pricing and approvals.
- #1 Window Repairs and Tune Ups 1
- #2 Guest House Renovation
- #3 Guest Bath Plumbing
- #4 Cast Iron Drain Pipe Repair
- #5 Engineer for sewer
- #6 Sewer Line
- #7 Gas Service
- #8 Storm Window Replacement
_________________________________________________________________________________