This blog is a way for us to keep track of everything that we talk about, suggest or do at your home over the life of our working relationship. It is updated, usually, on a daily basis during the project. Here we will record daily activity on the job, list recommendations on products and materials and add articles that pertain to your home.
Showing posts with label Master Closet. Show all posts
Showing posts with label Master Closet. Show all posts
Wednesday, April 3, 2013
Monday, April 1, 2013
Thursday, March 28, 2013
Meeting Notes - 3/25/13
PJM, JBC, Plymouth Closets,
Master Closet - Met with Plymouth Custom Closets. They have submitted shop drawings. Once approved it will 3 weeks for delivery and installation.
Island - We confirmed that the kitchen island stain color will be English Chestnut.
Tile - We will add tile in a herringbone pattern to the ceiling in the Guest Bath. We have decided to put a baseboard course in the master bath shower. It will consist of approx. 7 1/2" H x 12" W pieces of same tile as field.
Range Hood - We will fabricate a stainless steel extension for the range hood so that it meets top of cabinets as designed.
Guest House Kitchen Lighting - We will add three recessed lights over sink.
Guest House Microwave - After further reflection we have decided to put the microwave over the refrigerator. The size is correct. If we put it between the cabinets we would have to get a smaller unit. The
Master Closet - Met with Plymouth Custom Closets. They have submitted shop drawings. Once approved it will 3 weeks for delivery and installation.
Island - We confirmed that the kitchen island stain color will be English Chestnut.
Tile - We will add tile in a herringbone pattern to the ceiling in the Guest Bath. We have decided to put a baseboard course in the master bath shower. It will consist of approx. 7 1/2" H x 12" W pieces of same tile as field.
Range Hood - We will fabricate a stainless steel extension for the range hood so that it meets top of cabinets as designed.
Guest House Kitchen Lighting - We will add three recessed lights over sink.
Guest House Microwave - After further reflection we have decided to put the microwave over the refrigerator. The size is correct. If we put it between the cabinets we would have to get a smaller unit. The
Wednesday, March 27, 2013
Master Bedroom Closet Shops
Delivery time is 3 weeks after approval. Please let the office know of any changes asap.
| Cabinet Material (Cherry Melamine) |
| Tie Rack (30 Tie Capacity) |