1)      General overview and review of Kitchen and Master Bath Interiors. 
2)      Kitchen
    • Review top of Island - Wood or stone Pete is going to review with Anne.  Leaning toward stone.  PS will supply images or samples of "Super White" granite
    • Microwave in Island – drawer or door?
      Still need to confirm this.
    • Hood finish
      Still need to confirm this.
    • Confirm apron style for sink
      Still need to confirm this.
    • Pulls and hardware review
      Pete and Anne will look over options.  JB to email catalog
3)      Bar Area
    • Leaded glass for cabinet doors.
      This will be an up charge of $300.00 per door
    • Lights in upper cabinet and glass shelves.
      OK'd by client
    • Sink Finish
      Still need to confirm this.
    • Disposal in sink
      OK'd by client
    • Cabinet finish
      Still need to confirm this.  Stained or paint grade.
    • Review floor pattern
      PBS will send ideas to clients
    • Finish of woodwork and trim
      Confirmed that the transition and the area in front of the bar will all be stained trim
    • Pulls
      Pete and Anne will look over options.  JB to email catalog
4)      TV room
    • Wainscoting panel options – review and discuss
      Agreed on wainscoting option on description alone.  The panels will be similar to the cabinet doors.  The sample panel will be on site on Tuesday 12/11/12.
    • Finish – painted or stained
      All finishes in this area are to be painted except for the beams
    • AV requirements
      Still need to confirm this.
    • Stair details and finish
      Stairs will have painted risers, skirts, balusters and newels.  The handrails and newel caps are to be stained.
    • Pulls
      Pete and Anne will look over options.  JB to email catalog
5)      Hall
    • Molding profile for LED lights
      JB to send profile 
6)      Kitchen Terrace
    • Raised or at grade
      JB is working on discussed design.  Currently to be raised with steps toward yard and steps toward garage and side doors.
    • Size
      From breakfast nook to space between kitchen window and mudroom door.
    • Grill location
      To be determined.
    • Plantings
      To be determined.
7)      Master Bathroom
    • Vanity Design
      Confirmed as drawn.  Need to confirm top as stone or wood.
    • Vanity Finish
      White painted
    • Fan locations
      Confirmed that there will be 3 fans.  One in shower near door, one cetered on vanity and one in WC.  all will turn on together.
    • Pulls
      Pete and Anne will look over options.  JB to email catalog


Monday, November 12, 2012

Monday Meeting Itinerary 11/12/12


  1. Final decisions on painting
  2. Tile for Pool - Manufacturer not recommending border
  3. Master Bath Tub
  4. Paperwork
    1. Past invoices
      1. # 1071
      2. #1072
      3. #1067
      4. #1064
    2. Next installment

Tuesday, October 23, 2012

Friday Meeting Itinerary

This Friday 10/26/12:

  • We will walk through with the painter to discuss extent of paint job. 7:00 - 8:00
  • We will confirm Master bath tub and tub filler. 
  • Meet with Kevin to discuss landscaping. 8:00 - 9:00
  • Paper work 9:00 -9:15

Saturday, July 14, 2012

Meeting Itinerary for 7/16/12


  1. Kitchen discussion
  2. Mudroom door and window scenario
  3. Breakfast room
    • Floor
    • Exterior
    • Deck
  4. Chimneys
  5. Next steps

Saturday, May 19, 2012

PROJECT START - Friday 5/18/12

Meeting at 1431 Brush Hill Road  Attendees: Peter Millington, Anne Millington, Peter Stames

Archia presented a version of the contract that was to act as a intermediate contract until scope is determined and more detail on phase one can be detailed.  Updated contract and proposal is due by Friday 5/25/12.

Deposit for project ($25,000.00) was received and first installment was received ($50,000.00).