PM, PS, MN, MN2, JBC,
Doors - Met with Doug Handfield of LePage Windows and doors and finalized the Kitchen door with JB. It was signed and ordered today.
Insulation - Insulation installation started today. Will be ready for sheet rock next week.
Security - Pete is making a decision on security. He is aware of schedule. Needs to clarify number of smokes needed. Big Mike will confirm with fire department.
Speakers - We confirmed that we will put 2 speakers front to back in the kitchen toward the range. 4 speakers in the sitting room. The subwoofer will be installed into the cabinetry under the tv. Pete to supply dimensions of speakers and sub woofer. The dining room speakers will be run from there own amp. The wiring location is TBD.
Heat - We will remove one radiator from the staircase where it can be seen from the kitchen. We can relocate this to the hall where the cracked radiators are located. The other hall radiator can be replaced by the one that was removed from the mudroom. The mudroom should be sufficiently heated by the radiant heat so no wall mounted radiator will be re-installed.
This blog is a way for us to keep track of everything that we talk about, suggest or do at your home over the life of our working relationship. It is updated, usually, on a daily basis during the project. Here we will record daily activity on the job, list recommendations on products and materials and add articles that pertain to your home.
Showing posts with label Heat. Show all posts
Showing posts with label Heat. Show all posts
Monday, January 14, 2013
Friday, January 11, 2013
Heating issue
After receiving heat finally, yesterday, we were able to get some heat flowing to some radiators. So far we have found 3 cracked radiators. One in the master bath and two in the halls. The one in the master we can do without since we have another large unit and radiant heat. The two in the halls need to be swapped out. Barry suggests not using new radiators but making up the heat with high output baseboard elements producing high BTU's. Barry would build these himself and they would cost 60-70% less than the cost of new radiators.
The other issue involved with this is that there is asbestos wrapping both of these radiators. We have contacted the abatement company and will have it removed.
Barry is putting together the costs to replace the heat.
The other issue involved with this is that there is asbestos wrapping both of these radiators. We have contacted the abatement company and will have it removed.
Barry is putting together the costs to replace the heat.
Subscribe to: