Meeting Notes - 2/28/13

Anne and Laura Lee met this morning and (hopefully) ironed out all remaining details for the guest house. Here are the notes:

Guest House Bathroom:
  • Frost existing glass on exterior shower window
  • Paint false wall (removable panel) white to match rest of of the walls
  • LL to order all hardware including TP holder, towel bars and knobs
  • LL to order mirror - to be installed on false wall
  • Lower cabinet to be built to left of washer dryer with counter top with two doors on front for laundry product storage. Upper cabinet to continue above washer/dryer full depth for additional storage. All painted white.
Guest House Kitchen
  • LL to order hardware to match existing.
  • Cabinet around fridge?
  • Lighting fixtures are on order to be in next week
Guest House Loft
  • To be painted same as great room
  • Re-install found decorative shutters - need new hardware
  • Clean out
Guest House Great room
  • Wall sconces should be in mid-March (delayed)
Guest House Entry
  • Install wood shelf across top of closet as well as hanger bar - no closet system at this time
Guest House Bedroom
  • Install wood shelf across top of closet as well as hanger bar - no closet system at this time
  • LL to price out window treatment options

Friday, February 8, 2013

Project Notes 2/8/13

IS THERE SOMEONE TO PLOW?  STORM COMING.  There is salt and shovels on site. 

HVAC - PM has approved change order for the radiator upgrade in the guest bath and office bath.

AV - PM decided not to go with speakers in the master bedroom, master bath or office.  We will not be putting speakers in the breakfast nook but the wires will be buried in the ceiling and Folsom and Big Mike will note where they are located for future access.

Alarm - Has been installed and inspected.  Electrical inspector requested some additional basement work for safety.  Folsom will tighten up some hanging lights and wires.

Guest Bath - The expansion of the guest bath is complete with the exception of the soffiting of the ceiling over the tub.

Plaster - Plaster is moving along nicely with minor extras to date.

Carpentry - PM would like to replace the exterior door to the mudroom.  JB will give selection of style. 

Tuesday, February 5, 2013

Meeting Notes - 2/4/13

PM, PS, MN

HVAC - PM requested that Barry come to 1057 to check out duct work and system for cleaning etc.  That will happen 2/5.  
PM also requested pricing for the smaller wall hung radiators to be installed in the guest bath and the office bath.

AV - PM requested a meeting with Folsom to go over speaker and stereo locations.  PS will set up.

Plaster - We are currently well into the plaster portion of the project.  There are some fussy extras but it is mainly on course.  The 3rd floor is completed and read or paint.
Alarm - The alarm installation has started and should be done by 2/7

PlumbingThe faucet for the master bathroom tub will be on site 2/5. The plumbers can then install and the floors can be closed up.

Tile - JB will be supplying all master bath tile materials 2/6.  Tile installer will have all tile materials and specs 2/6.  Bathrooms should be ready for tile installation by early next week.
Guest Bath - Guest Bath has been demoed to the new dimensions.  Tub will be delivered on 2/7.