Meeting Notes - 2/28/13

Anne and Laura Lee met this morning and (hopefully) ironed out all remaining details for the guest house. Here are the notes:

Guest House Bathroom:
  • Frost existing glass on exterior shower window
  • Paint false wall (removable panel) white to match rest of of the walls
  • LL to order all hardware including TP holder, towel bars and knobs
  • LL to order mirror - to be installed on false wall
  • Lower cabinet to be built to left of washer dryer with counter top with two doors on front for laundry product storage. Upper cabinet to continue above washer/dryer full depth for additional storage. All painted white.
Guest House Kitchen
  • LL to order hardware to match existing.
  • Cabinet around fridge?
  • Lighting fixtures are on order to be in next week
Guest House Loft
  • To be painted same as great room
  • Re-install found decorative shutters - need new hardware
  • Clean out
Guest House Great room
  • Wall sconces should be in mid-March (delayed)
Guest House Entry
  • Install wood shelf across top of closet as well as hanger bar - no closet system at this time
Guest House Bedroom
  • Install wood shelf across top of closet as well as hanger bar - no closet system at this time
  • LL to price out window treatment options

Tuesday, February 26, 2013

Status Update 2/26/13

Tile - Starting today in baths that are ready.  Waiting on Tile confirmation for Kitchen and master bath from JB. Mudroom tile has been ordered and should be in this week.  Jambs at Offiec shower to be Carrera.  All thresholds to be Carrera.

HVAC - Radiant heat in the kitchen and the mudroom should be installed by end of day today and pressure tested.  Low profile radiators


Bath Hardware - Laura Lee and JB will be putting together a list of hardware for the baths.

Flooring - Hardwood flooring will be starting in the kitchen on Thursday or Friday.  There will be no medallion at this point.

Stucco - We will be meeting with our stucco company to look at reproducing the textured walls in the kitchen and touching up the other areas in the house next Tuesday.  

Shower Glass - Has been installed in the Guest House.


Tuesday, December 11, 2012