Monday, November 5, 2012

Thursday Meeting Notes

Attendees: PJM, JB Clancy, PBS, Mike Norton's, Dan Colella, John Folsom

  • Cabinetry - Went over shop drawings for kitchen cabinets.  
    • Confirmation of refrigerator configuration. 
    • Will change out range to Wolf range top. 
  • Electrical - Went over lighting plans for Kitchen and Master Bath
    • JB will update plans.  John Folsom is on board with all changes
    • Added locations for speakers. 
      • Surround sound in sitting area.
      • 2 speakers in kitchen - sited front to back.
      • 2 speakers in wet bar area of kitchen - sited front to back.
      • 2 speakers in breakfast nook
    • More to come from Electrician.
  • Flooring - NOTE: Breakfast nook will be hardwood flooring not tile.
  • Millingtons tasks
    • Need bathtub and faucet for the Master Bath
    • Need to confirm Range top choice for Main House (MH) kitchen
    • Determine what electrical will be needed for makeup table as well as lighting.
  • Carpentry - Wet bar area of the kitchen will have its ceiling lowered enough to cover the 2" drain pipes that had to be installed at the ceiling.
  • Landscaping - Kevin will pull out hedges between garden and pool.
  • Painting - Walked through with Paul Schroeder.
    • Went over all issues with paint and plastering.
    • Notes on this conversation to come.