- Cabinetry - Went over shop drawings for kitchen cabinets.
- Confirmation of refrigerator configuration.
- Will change out range to Wolf range top.
- Electrical - Went over lighting plans for Kitchen and Master Bath
- JB will update plans. John Folsom is on board with all changes
- Added locations for speakers.
- Surround sound in sitting area.
- 2 speakers in kitchen - sited front to back.
- 2 speakers in wet bar area of kitchen - sited front to back.
- 2 speakers in breakfast nook
- More to come from Electrician.
- Flooring - NOTE: Breakfast nook will be hardwood flooring not tile.
- Millingtons tasks
- Need bathtub and faucet for the Master Bath
- Need to confirm Range top choice for Main House (MH) kitchen
- Determine what electrical will be needed for makeup table as well as lighting.
- Carpentry - Wet bar area of the kitchen will have its ceiling lowered enough to cover the 2" drain pipes that had to be installed at the ceiling.
- Landscaping - Kevin will pull out hedges between garden and pool.
- Painting - Walked through with Paul Schroeder.
- Went over all issues with paint and plastering.
- Notes on this conversation to come.
This blog is a way for us to keep track of everything that we talk about, suggest or do at your home over the life of our working relationship. It is updated, usually, on a daily basis during the project. Here we will record daily activity on the job, list recommendations on products and materials and add articles that pertain to your home.
Monday, November 5, 2012
Thursday Meeting Notes
Attendees: PJM, JB Clancy, PBS, Mike Norton's, Dan Colella, John Folsom