Doors - Met with Doug Handfield of LePage Windows and doors and finalized the Kitchen door with JB.  It was signed and ordered today.

Insulation - Insulation installation started today.  Will be ready for sheet rock next week.

Security - Pete is making a decision on security.  He is aware of schedule.  Needs to clarify number of smokes needed.  Big Mike will confirm with fire department.

Speakers - We confirmed that we will put 2 speakers front to back in the kitchen toward the range.  4 speakers in the sitting room.  The subwoofer will be installed into the cabinetry under the tv. Pete to supply dimensions of speakers and sub woofer.  The dining room speakers will be run from there own amp.  The wiring location is TBD.

Heat - We will remove one radiator from the staircase where it can be seen from the kitchen.  We can relocate this to the hall where the cracked radiators are located.  The other hall radiator can be replaced by the one that was removed from the mudroom.  The mudroom should be sufficiently heated by the radiant heat so no wall mounted radiator will be re-installed.