PM, PS, MN, MN2, JBC,
Doors - Met with Doug Handfield of LePage Windows and doors and finalized the Kitchen door with JB. It was signed and ordered today.
Insulation - Insulation installation started today. Will be ready for sheet rock next week.
Security - Pete is making a decision on security. He is aware of schedule. Needs to clarify number of smokes needed. Big Mike will confirm with fire department.
Speakers - We confirmed that we will put 2 speakers front to back in the kitchen toward the range. 4 speakers in the sitting room. The subwoofer will be installed into the cabinetry under the tv. Pete to supply dimensions of speakers and sub woofer. The dining room speakers will be run from there own amp. The wiring location is TBD.
Heat - We will remove one radiator from the staircase where it can be seen from the kitchen. We can relocate this to the hall where the cracked radiators are located. The other hall radiator can be replaced by the one that was removed from the mudroom. The mudroom should be sufficiently heated by the radiant heat so no wall mounted radiator will be re-installed.
This blog is a way for us to keep track of everything that we talk about, suggest or do at your home over the life of our working relationship. It is updated, usually, on a daily basis during the project. Here we will record daily activity on the job, list recommendations on products and materials and add articles that pertain to your home.
Monday, January 14, 2013
Friday, January 11, 2013
Heating issue
After receiving heat finally, yesterday, we were able to get some heat flowing to some radiators. So far we have found 3 cracked radiators. One in the master bath and two in the halls. The one in the master we can do without since we have another large unit and radiant heat. The two in the halls need to be swapped out. Barry suggests not using new radiators but making up the heat with high output baseboard elements producing high BTU's. Barry would build these himself and they would cost 60-70% less than the cost of new radiators.
The other issue involved with this is that there is asbestos wrapping both of these radiators. We have contacted the abatement company and will have it removed.
Barry is putting together the costs to replace the heat.
The other issue involved with this is that there is asbestos wrapping both of these radiators. We have contacted the abatement company and will have it removed.
Barry is putting together the costs to replace the heat.
Friday, January 4, 2013
Appliance final list - Confirmed and ordered 1/10/13
| Double wall oven: Wolf DO30F/S 30”w stainless electric |
Refrigerator: Subzero BI30U/OLH 30”w built-in bottom mount,panel ready,interior icemaker,left hinged
Refrigerator: Subzero BI30U/ORH same as above but with right hinge
Side x side install kit: 7004810($769) includes dual wide grille and toe kick,center trip strip,heater and hardware
|
| Refrigerator drawers: Subzero 700BR 27”w all refrigerator drawers,panel ready |
| Dishwasher: Miele G5175SCVI with the addition of China setting,hard water softening system, more flip down tynes on bottom rack and 2db quieter. These are the 2 base models, 2 or 3 models are available at higher prices |
Microwave Option 1:
Changed to Sharp unit
|
| Range top: Wolf SRT486G 48”w 6 burners with griddle,”natural” gas,comes with island trim(can choose black, red or stainless knobs) |
| Warming drawer: Wolf WWD30 30”wide, requires integrated drawer front(808152) for ($67) to accept custom wood panel |
Tuesday, December 18, 2012
Raised Terrace notes (From JB)
Here are some plans and an exterior sketch showing you what a raised terrace might look like on the back of the house. Below are some comments:
1. The advantages of raising the terrace will be a more natural connection between the terrace and the kitchen.
2. The terrace would be about 18” high – perfect seat height. - The terrace is that height or the stone wall?
3. The steps are captured in the thickness of the wall, so they don’t project out or cut into the terrace.
4. I would suggest bringing the lawn right up to the steps of the terrace on the garden side.
5. On the garage side of the terrace there is another set of stairs linking the garage door and the mudroom door to the terrace.
6. I am adding another gate next to the terrace to create a better connection with the terrace and the formal garden.
7. The gas grill would go under the kitchen windows.
8. The screen of trees have been removed but there may still be a need for a single tree on the road side of the terrace to make the terrace feel more intimate.
PS Notes: The window well will need to be filled in. and downspout rerouted.
PS Notes: The window well will need to be filled in. and downspout rerouted.
Monday, December 17, 2012
Tuesday, December 11, 2012
Friday, December 7, 2012
Monday Meeting Notes for 12/10/12
1) General overview and review of Kitchen and Master Bath Interiors.
2) Kitchen
2) Kitchen
- Review top of Island - Wood or stone Pete is going to review with Anne. Leaning toward stone. PS will supply images or samples of "Super White" granite
- Microwave in Island – drawer or door?
Still need to confirm this. - Hood finish
Still need to confirm this. - Confirm apron style for sink
Still need to confirm this. - Pulls and hardware review
Pete and Anne will look over options. JB to email catalog
- Leaded glass for cabinet doors.
This will be an up charge of $300.00 per door - Lights in upper cabinet and glass shelves.
OK'd by client - Sink Finish
Still need to confirm this. - Disposal in sink
OK'd by client - Cabinet finish
Still need to confirm this. Stained or paint grade. - Review floor pattern
PBS will send ideas to clients - Finish of woodwork and trim
Confirmed that the transition and the area in front of the bar will all be stained trim - Pulls
Pete and Anne will look over options. JB to email catalog
- Wainscoting panel options – review and discuss
Agreed on wainscoting option on description alone. The panels will be similar to the cabinet doors. The sample panel will be on site on Tuesday 12/11/12. - Finish – painted or stained
All finishes in this area are to be painted except for the beams - AV requirements
Still need to confirm this. - Stair details and finish
Stairs will have painted risers, skirts, balusters and newels. The handrails and newel caps are to be stained. - Pulls
Pete and Anne will look over options. JB to email catalog
- Molding profile for LED lights
JB to send profile
- Raised or at grade
JB is working on discussed design. Currently to be raised with steps toward yard and steps toward garage and side doors. - Size
From breakfast nook to space between kitchen window and mudroom door. - Grill location
To be determined. - Plantings
To be determined.
- Vanity Design
Confirmed as drawn. Need to confirm top as stone or wood. - Vanity Finish
White painted - Fan locations
Confirmed that there will be 3 fans. One in shower near door, one cetered on vanity and one in WC. all will turn on together. - Pulls
Pete and Anne will look over options. JB to email catalog